MBT, Indonesia 03

IDN - ERiC Malang Project, TPA Supit Urang, Malang City

MBT, Indonesia 03

Technical data

Input material: Household waste

Throughput: 5-10 t/h (due to plant)

Scope of supply

Shredding: 1x Terminator 1700 direct

Screen: Drum screen 18/45
Mobile drum screen Primus

Turning: Topturn X55

Separation: Electromagnetic separator
Supervisor

Start up: March 2021

  • Request

      *Required fields.
    • Find a dealer
    • Products