FRA – Allee des Platanes 54, 77100 Meaux
Wet treatment plant, Tridex
Technical data
Input material: Leftovers unpacked
overstocked food packaged
Quantity: up to 20.000 t/a
Scope of supply
Preparation of the planning; delivery of the machines (crusher, dissolver, sedimentation basin, pumps, pipe crusher, screen, screw press, etc.), pipeline construction (suspension, compressed air and fresh water) and complete electrical engineering and control
Installed power:Â 420 kW
Start up: October 2011 (no longer in operation)